NO | Status of National Research Projects | Duration | Dedicated Agency | Role |
---|---|---|---|---|
1 | 5kW commercial high efficiency fuel cell - engine hybrid system design package and prototype development | 01.10.2017 ~ 31.12.2020 |
Korea Industrial Technology Evaluation Agency | Participation |
2 | Development of temperature TC / CC stroke monitoring / diagnosis system for intelligent vacuum circuit breaker | 01.11.2017 ~ 31.10.2019 |
Department of Small & Medium Venture Business | Superintendence |
3 | Development of fuel cell-waste-based new and renewable hybrid system engineering technology | 01.12.2016 ~ 30.11.2023 |
Korea Energy Technology Evaluation Institute | Participation |
4 | Developed multi-channel power measuring device using air core coil sensor | 01.12.2015 ~ 30.11.2016 |
Department of Small & Medium Venture Business | Superintendence |
5 | Developed smart monitoring system to improve operating efficiency of 1MW or less solar power plant | 01.05.2015 ~ 30.04.2018 |
Korea Industrial Technology Development Agency | Participation |
6 | Development of 500Hz class ship DC micro grid system | 01.12.2014 ~ 30.09.2018 |
Korea Energy Technology Evaluation Institute | Superintendence |
7 | Development of panel sloping solar power generation system equipped with high efficiency outdoor solar inverter for mid-capacity class DC connection-integral-parallel type | 01.11.2013 ~ 31.01.2015 |
Department of Small & Medium Venture Business | Superintendence |